W Clayton Pkwy WB over Hcfcd Ditch
FairPosted for loadHarris County, Texas · 1.90 MI W of US 59 · Structure no. 121020B69685011
- Built
- 1967
- 58 years old
- Condition
- Fair
- inspected September 2023
- Type
- Slab
- Concrete Continuous
- Length
- 67 ft
- 3 main spans
- Daily traffic
- 14,233
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
W Clayton Pkwy WB over Hcfcd Ditch is a concrete continuous slab carrying W Clayton Pkwy WB over Hcfcd Ditch in Harris County, Texas. It was built in 1967, so it is 58 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 14,233 vehicles a day, roughly 5% of them trucks, projected to reach 19,927 by 2042. The structure is 67 ft (20.4 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W Clayton Pkwy WB over Hcfcd Ditch built?
It was built in 1967, making it 58 years old in 2025.
What condition is W Clayton Pkwy WB over Hcfcd Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does W Clayton Pkwy WB over Hcfcd Ditch carry?
About 14,233 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is W Clayton Pkwy WB over Hcfcd Ditch?
The structure is 67 ft (20.4 m) long with a longest span of 26 ft (7.9 m) and a deck 40 ft wide.
Who owns W Clayton Pkwy WB over Hcfcd Ditch?
It is owned by the City or Municipal Highway Agency.