Saint Lo RD over Hcfcd Ditch
FairHarris County, Texas · 0.30 MI SW of Mlk Blvd · Structure no. 121020B60157037
- Built
- 1960
- 65 years old, rebuilt 1998
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 29 ft
- 2 main spans
- Daily traffic
- 1,530
- 2010 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Saint Lo RD over Hcfcd Ditch is a wood or timber stringer/multi-beam or girder carrying Saint Lo RD over Hcfcd Ditch in Harris County, Texas. It was built in 1960 and reconstructed in 1998, so it is 65 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,530 vehicles a day, projected to reach 2,500 by 2030. The structure is 29 ft (8.8 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Saint Lo RD over Hcfcd Ditch built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1998.
What condition is Saint Lo RD over Hcfcd Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Saint Lo RD over Hcfcd Ditch carry?
About 1,530 vehicles per day (2010 count).
How long is Saint Lo RD over Hcfcd Ditch?
The structure is 29 ft (8.8 m) long with a longest span of 14 ft (4.3 m) and a deck 50 ft wide.
Who owns Saint Lo RD over Hcfcd Ditch?
It is owned by the City or Municipal Highway Agency.