US Bridges

S Shaver ST over Hcfcd Ditch

Good

Harris County, Texas · 1.05 MI NE of IH 45 · Structure no. 121020B58801589

Built
2014
11 years old
Condition
Good
inspected December 2023
Type
Culvert
Concrete
Length
45 ft
3 main spans
Daily traffic
18,414
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

S Shaver ST over Hcfcd Ditch is a concrete culvert carrying S Shaver ST over Hcfcd Ditch in Harris County, Texas. It was built in 2014, so it is 11 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,414 vehicles a day, roughly 7% of them trucks, projected to reach 25,780 by 2038. The structure is 45 ft (13.7 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesS Shaver ST
CrossesHcfcd Ditch
Location1.05 MI NE of IH 45
RouteCity Street 0
StateTexas
Coordinates29.635, -95.21379
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length45 ft (13.7 m)
Longest span13 ft (4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,414 (2018)
Projected traffic25,780 by 2038
Trucks7%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S Shaver ST over Hcfcd Ditch built?

It was built in 2014, making it 11 years old in 2025.

What condition is S Shaver ST over Hcfcd Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does S Shaver ST over Hcfcd Ditch carry?

About 18,414 vehicles per day (2018 count), of which roughly 7% are trucks.

How long is S Shaver ST over Hcfcd Ditch?

The structure is 45 ft (13.7 m) long with a longest span of 13 ft (4 m).

Who owns S Shaver ST over Hcfcd Ditch?

It is owned by the City or Municipal Highway Agency.