US Bridges

Pinemont ST EB over Hcfcd Ditch

Good

Harris County, Texas · 0.4 MI W of US 290 · Structure no. 121020B51609048

Built
1997
28 years old
Condition
Good
inspected November 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
90 ft
3 main spans
Daily traffic
16,000
2012 count
Owner
City
City or Municipal Highway Agency

About this bridge

Pinemont ST EB over Hcfcd Ditch is a prestressed concrete box beam or girders - multiple carrying Pinemont ST EB over Hcfcd Ditch in Harris County, Texas. It was built in 1997, so it is 28 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,000 vehicles a day, roughly 2% of them trucks, projected to reach 17,600 by 2032. The structure is 90 ft (27.4 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPinemont ST EB
CrossesHcfcd Ditch
Location0.4 MI W of US 290
RouteCity Street 0
StateTexas
Coordinates29.84143, -95.49647
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length90 ft (27.4 m)
Longest span30 ft (9.1 m)
Deck width33 ft (10.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,000 (2012)
Projected traffic17,600 by 2032
Trucks2%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$5,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Pinemont ST EB over Hcfcd Ditch built?

It was built in 1997, making it 28 years old in 2025.

What condition is Pinemont ST EB over Hcfcd Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Pinemont ST EB over Hcfcd Ditch carry?

About 16,000 vehicles per day (2012 count), of which roughly 2% are trucks.

How long is Pinemont ST EB over Hcfcd Ditch?

The structure is 90 ft (27.4 m) long with a longest span of 30 ft (9.1 m) and a deck 33 ft wide.

Who owns Pinemont ST EB over Hcfcd Ditch?

It is owned by the City or Municipal Highway Agency.