US Bridges

Panair ST over Berry Creek

Fair

Harris County, Texas · 0.10 MI E of Monroe ST · Structure no. 121020B49793041

Built
1960
65 years old, rebuilt 1985
Condition
Fair
inspected September 2023
Type
Culvert
Concrete
Length
44 ft
4 main spans
Daily traffic
880
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

Panair ST over Berry Creek is a concrete culvert carrying Panair ST over Berry Creek in Harris County, Texas. It was built in 1960 and reconstructed in 1985, so it is 65 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 880 vehicles a day, projected to reach 1,000 by 2031. The structure is 44 ft (13.4 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPanair ST
CrossesBerry Creek
Location0.10 MI E of Monroe ST
RouteCity Street 0
StateTexas
Coordinates29.65201, -95.26278
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadUnknown
Structure length44 ft (13.4 m)
Longest span10 ft (3 m)
Deck width33 ft (10.2 m)
Roadway width32 ft (9.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic880 (2011)
Projected traffic1,000 by 2031
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$64,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Panair ST over Berry Creek built?

It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1985.

What condition is Panair ST over Berry Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Panair ST over Berry Creek carry?

About 880 vehicles per day (2011 count).

How long is Panair ST over Berry Creek?

The structure is 44 ft (13.4 m) long with a longest span of 10 ft (3 m) and a deck 33 ft wide.

Who owns Panair ST over Berry Creek?

It is owned by the City or Municipal Highway Agency.