West Orem DR EB over Hcfcd Ditch
GoodPosted for loadHarris County, Texas · 2.70 MI E of S Post Oak · Structure no. 121020B49009007
- Built
- 1969
- 56 years old
- Condition
- Good
- inspected October 2023
- Type
- Slab
- Concrete Continuous
- Length
- 92 ft
- 3 main spans
- Daily traffic
- 5,000
- 2011 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
West Orem DR EB over Hcfcd Ditch is a concrete continuous slab carrying West Orem DR EB over Hcfcd Ditch in Harris County, Texas. It was built in 1969, so it is 56 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 5,000 vehicles a day, projected to reach 5,100 by 2031. The structure is 92 ft (28 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was West Orem DR EB over Hcfcd Ditch built?
It was built in 1969, making it 56 years old in 2025.
What condition is West Orem DR EB over Hcfcd Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does West Orem DR EB over Hcfcd Ditch carry?
About 5,000 vehicles per day (2011 count).
How long is West Orem DR EB over Hcfcd Ditch?
The structure is 92 ft (28 m) long with a longest span of 34 ft (10.4 m) and a deck 31 ft wide.
Who owns West Orem DR EB over Hcfcd Ditch?
It is owned by the City or Municipal Highway Agency.