West Orem DR EB over Hcfcd Ditch
FairPosted for loadHarris County, Texas · 1.65 MI E of S Post Oak · Structure no. 121020B49009005
- Built
- 1963
- 62 years old
- Condition
- Fair
- inspected August 2023
- Type
- Slab
- Concrete Continuous
- Length
- 66 ft
- 3 main spans
- Daily traffic
- 6,310
- 2011 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
West Orem DR EB over Hcfcd Ditch is a concrete continuous slab carrying West Orem DR EB over Hcfcd Ditch in Harris County, Texas. It was built in 1963, so it is 62 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 6,310 vehicles a day, projected to reach 6,568 by 2031. The structure is 66 ft (20.1 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was West Orem DR EB over Hcfcd Ditch built?
It was built in 1963, making it 62 years old in 2025.
What condition is West Orem DR EB over Hcfcd Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does West Orem DR EB over Hcfcd Ditch carry?
About 6,310 vehicles per day (2011 count).
How long is West Orem DR EB over Hcfcd Ditch?
The structure is 66 ft (20.1 m) long with a longest span of 24 ft (7.3 m) and a deck 33 ft wide.
Who owns West Orem DR EB over Hcfcd Ditch?
It is owned by the City or Municipal Highway Agency.