E Orem DR WB over Mykawa RD & UP RR
GoodHarris County, Texas · 1.20 MI W of Telephone RD · Structure no. 121020B49001101
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 1,337 ft
- 2 main spans
- Daily traffic
- 2,500
- 2013 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
E Orem DR WB over Mykawa RD & UP RR is a prestressed concrete continuous stringer/multi-beam or girder carrying E Orem DR WB over Mykawa RD & UP RR in Harris County, Texas. It was built in 2005, so it is 20 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,500 vehicles a day, projected to reach 6,568 by 2035. The structure is 1,337 ft (407.5 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E Orem DR WB over Mykawa RD & UP RR built?
It was built in 2005, making it 20 years old in 2025.
What condition is E Orem DR WB over Mykawa RD & UP RR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does E Orem DR WB over Mykawa RD & UP RR carry?
About 2,500 vehicles per day (2013 count).
How long is E Orem DR WB over Mykawa RD & UP RR?
The structure is 1,337 ft (407.5 m) long with a longest span of 158 ft (48.2 m) and a deck 34 ft wide.
Who owns E Orem DR WB over Mykawa RD & UP RR?
It is owned by the City or Municipal Highway Agency.