W Fuqua RD EB over Hcfcd C143-00-00
FairHarris County, Texas · 2.15 MI E of S Post Oak · Structure no. 121020B25905001
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 62 ft
- 1 main span
- Daily traffic
- 8,770
- 2011 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
W Fuqua RD EB over Hcfcd C143-00-00 is a prestressed concrete box beam or girders - multiple carrying W Fuqua RD EB over Hcfcd C143-00-00 in Harris County, Texas. It was built in 1984, so it is 41 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,770 vehicles a day, roughly 2% of them trucks, projected to reach 8,770 by 2031. The structure is 62 ft (18.9 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W Fuqua RD EB over Hcfcd C143-00-00 built?
It was built in 1984, making it 41 years old in 2025.
What condition is W Fuqua RD EB over Hcfcd C143-00-00 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does W Fuqua RD EB over Hcfcd C143-00-00 carry?
About 8,770 vehicles per day (2011 count), of which roughly 2% are trucks.
How long is W Fuqua RD EB over Hcfcd C143-00-00?
The structure is 62 ft (18.9 m) long with a longest span of 60 ft (18.3 m) and a deck 33 ft wide.
Who owns W Fuqua RD EB over Hcfcd C143-00-00?
It is owned by the City or Municipal Highway Agency.