Clover Valley DR over Hcfcd Ditch G103-80-01
GoodHarris County, Texas · 0.5 MI S of Mills Branch · Structure no. 121020B08781072
- Built
- 1989
- 36 years old
- Condition
- Good
- inspected December 2023
- Type
- Other
- Prestressed Concrete
- Length
- 66 ft
- 3 main spans
- Daily traffic
- 250
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Clover Valley DR over Hcfcd Ditch G103-80-01 is a prestressed concrete other carrying Clover Valley DR over Hcfcd Ditch G103-80-01 in Harris County, Texas. It was built in 1989, so it is 36 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 250 vehicles a day, roughly 3% of them trucks, projected to reach 300 by 2041. The structure is 66 ft (20.1 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Clover Valley DR over Hcfcd Ditch G103-80-01 built?
It was built in 1989, making it 36 years old in 2025.
What condition is Clover Valley DR over Hcfcd Ditch G103-80-01 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Clover Valley DR over Hcfcd Ditch G103-80-01 carry?
About 250 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is Clover Valley DR over Hcfcd Ditch G103-80-01?
The structure is 66 ft (20.1 m) long with a longest span of 22 ft (6.7 m) and a deck 40 ft wide.
Who owns Clover Valley DR over Hcfcd Ditch G103-80-01?
It is owned by the City or Municipal Highway Agency.