Bay Area Blvd WB over Hcfcd Ditch
FairPosted for loadHarris County, Texas · 0.1 MI SW of El Camino · Structure no. 121020B06029002
- Built
- 1966
- 59 years old, rebuilt 1990
- Condition
- Fair
- inspected August 2023
- Type
- Other
- Prestressed Concrete
- Length
- 84 ft
- 3 main spans
- Daily traffic
- 5,470
- 2009 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Bay Area Blvd WB over Hcfcd Ditch is a prestressed concrete other carrying Bay Area Blvd WB over Hcfcd Ditch in Harris County, Texas. It was built in 1966 and reconstructed in 1990, so it is 59 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 5,470 vehicles a day, projected to reach 10,000 by 2028. The structure is 84 ft (25.6 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bay Area Blvd WB over Hcfcd Ditch built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1990.
What condition is Bay Area Blvd WB over Hcfcd Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Bay Area Blvd WB over Hcfcd Ditch carry?
About 5,470 vehicles per day (2009 count).
How long is Bay Area Blvd WB over Hcfcd Ditch?
The structure is 84 ft (25.6 m) long with a longest span of 28 ft (8.5 m) and a deck 42 ft wide.
Who owns Bay Area Blvd WB over Hcfcd Ditch?
It is owned by the City or Municipal Highway Agency.