US Bridges

Mckay DR over Hcfcd Ditch P130-09-00

Good

Harris County, Texas · 0.4 MI N of Will Clayton · Structure no. 121020B00588066

Built
1991
34 years old
Condition
Good
inspected December 2023
Type
Other
Prestressed Concrete
Length
75 ft
3 main spans
Daily traffic
8,805
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Mckay DR over Hcfcd Ditch P130-09-00 is a prestressed concrete other carrying Mckay DR over Hcfcd Ditch P130-09-00 in Harris County, Texas. It was built in 1991, so it is 34 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,805 vehicles a day, roughly 2% of them trucks, projected to reach 12,327 by 2041. The structure is 75 ft (22.9 m) long and 60 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesMckay DR
CrossesHcfcd Ditch P130-09-00
Location0.4 MI N of Will Clayton
RouteCity Street 0
StateTexas
Coordinates29.98806, -95.27804
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeOther
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length75 ft (22.9 m)
Longest span25 ft (7.6 m)
Deck width60 ft (18.3 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,805 (2021)
Projected traffic12,327 by 2041
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mckay DR over Hcfcd Ditch P130-09-00 built?

It was built in 1991, making it 34 years old in 2025.

What condition is Mckay DR over Hcfcd Ditch P130-09-00 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Mckay DR over Hcfcd Ditch P130-09-00 carry?

About 8,805 vehicles per day (2021 count), of which roughly 2% are trucks.

How long is Mckay DR over Hcfcd Ditch P130-09-00?

The structure is 75 ft (22.9 m) long with a longest span of 25 ft (7.6 m) and a deck 60 ft wide.

Who owns Mckay DR over Hcfcd Ditch P130-09-00?

It is owned by the City or Municipal Highway Agency.