Bay Area Blvd WB over Hcfcd Ditch
FairHarris County, Texas · 0.10 MI NE of Chemical RD · Structure no. 121020AA9958002
- Built
- 1970
- 55 years old, rebuilt 2015
- Condition
- Fair
- inspected September 2023
- Type
- Tee Beam
- Concrete
- Length
- 110 ft
- 3 main spans
- Daily traffic
- 9,261
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
Bay Area Blvd WB over Hcfcd Ditch is a concrete tee beam carrying Bay Area Blvd WB over Hcfcd Ditch in Harris County, Texas. It was built in 1970 and reconstructed in 2015, so it is 55 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,261 vehicles a day, projected to reach 10,000 by 2028. The structure is 110 ft (33.5 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bay Area Blvd WB over Hcfcd Ditch built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2015.
What condition is Bay Area Blvd WB over Hcfcd Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Bay Area Blvd WB over Hcfcd Ditch carry?
About 9,261 vehicles per day (2016 count).
How long is Bay Area Blvd WB over Hcfcd Ditch?
The structure is 110 ft (33.5 m) long with a longest span of 36 ft (11 m) and a deck 43 ft wide.
Who owns Bay Area Blvd WB over Hcfcd Ditch?
It is owned by the County Highway Agency.