US Bridges

West RD WB over Hcfcd Ditch

Fair

Harris County, Texas · 0.1 MI E of Beltway 8 · Structure no. 121020AA7704003

Built
1998
27 years old
Condition
Fair
inspected September 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
120 ft
3 main spans
Daily traffic
14,014
2016 count
Owner
County
County Highway Agency

About this bridge

West RD WB over Hcfcd Ditch is a prestressed concrete box beam or girders - multiple carrying West RD WB over Hcfcd Ditch in Harris County, Texas. It was built in 1998, so it is 27 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 14,014 vehicles a day, projected to reach 6,500 by 2029. The structure is 120 ft (36.6 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWest RD WB
CrossesHcfcd Ditch
Location0.1 MI E of Beltway 8
RouteCounty Highway 0
StateTexas
Coordinates29.90281, -95.54948
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length120 ft (36.6 m)
Longest span40 ft (12.2 m)
Deck width34 ft (10.4 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,014 (2016)
Projected traffic6,500 by 2029
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$8,000
NavigationNo navigation control on waterway

Frequently asked questions

When was West RD WB over Hcfcd Ditch built?

It was built in 1998, making it 27 years old in 2025.

What condition is West RD WB over Hcfcd Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does West RD WB over Hcfcd Ditch carry?

About 14,014 vehicles per day (2016 count).

How long is West RD WB over Hcfcd Ditch?

The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 34 ft wide.

Who owns West RD WB over Hcfcd Ditch?

It is owned by the County Highway Agency.