US Bridges

Fry RD NB over Bear Creek

Good

Harris County, Texas · 1.90 MI S of FM 529 · Structure no. 121020AA6914002

Built
1983
42 years old
Condition
Good
inspected August 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
92 ft
2 main spans
Daily traffic
1,000
2013 count
Owner
County
County Highway Agency

About this bridge

Fry RD NB over Bear Creek is a prestressed concrete box beam or girders - multiple carrying Fry RD NB over Bear Creek in Harris County, Texas. It was built in 1983, so it is 42 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 1% of them trucks, projected to reach 8,000 by 2033. The structure is 92 ft (28 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFry RD NB
CrossesBear Creek
Location1.90 MI S of FM 529
RouteCounty Highway 0
StateTexas
Coordinates29.85273, -95.71862
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length92 ft (28 m)
Longest span45 ft (13.7 m)
Deck width34 ft (10.4 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2013)
Projected traffic8,000 by 2033
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$5,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Fry RD NB over Bear Creek built?

It was built in 1983, making it 42 years old in 2025.

What condition is Fry RD NB over Bear Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Fry RD NB over Bear Creek carry?

About 1,000 vehicles per day (2013 count), of which roughly 1% are trucks.

How long is Fry RD NB over Bear Creek?

The structure is 92 ft (28 m) long with a longest span of 45 ft (13.7 m) and a deck 34 ft wide.

Who owns Fry RD NB over Bear Creek?

It is owned by the County Highway Agency.