US Bridges

Addicks-Clodine NB over Hcfcd Ditch

FairPosted for load

Harris County, Texas · 0.10 MI N of Bellaire · Structure no. 121020AA2831002

Built
1970
55 years old
Condition
Fair
inspected October 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
91 ft
3 main spans
Daily traffic
6,804
2016 count
Owner
County
County Highway Agency

About this bridge

Addicks-Clodine NB over Hcfcd Ditch is a concrete stringer/multi-beam or girder carrying Addicks-Clodine NB over Hcfcd Ditch in Harris County, Texas. It was built in 1970, so it is 55 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 6,804 vehicles a day, roughly 1% of them trucks, projected to reach 3,000 by 2035. The structure is 91 ft (27.7 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesAddicks-Clodine NB
CrossesHcfcd Ditch
Location0.10 MI N of Bellaire
RouteCounty Highway 0
StateTexas
Coordinates29.70147, -95.66389
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length91 ft (27.7 m)
Longest span30 ft (9.1 m)
Deck width31 ft (9.4 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,804 (2016)
Projected traffic3,000 by 2035
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$6,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Addicks-Clodine NB over Hcfcd Ditch built?

It was built in 1970, making it 55 years old in 2025.

What condition is Addicks-Clodine NB over Hcfcd Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does Addicks-Clodine NB over Hcfcd Ditch carry?

About 6,804 vehicles per day (2016 count), of which roughly 1% are trucks.

How long is Addicks-Clodine NB over Hcfcd Ditch?

The structure is 91 ft (27.7 m) long with a longest span of 30 ft (9.1 m) and a deck 31 ft wide.

Who owns Addicks-Clodine NB over Hcfcd Ditch?

It is owned by the County Highway Agency.