Mauna Loa Lane over Hcfcd Ditch
GoodHarris County, Texas · 0.1 MI W of N Gessner · Structure no. 121020AA2476001
- Built
- 1988
- 37 years old
- Condition
- Good
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 137 ft
- 3 main spans
- Daily traffic
- 4,130
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
Mauna Loa Lane over Hcfcd Ditch is a prestressed concrete box beam or girders - multiple carrying Mauna Loa Lane over Hcfcd Ditch in Harris County, Texas. It was built in 1988, so it is 37 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,130 vehicles a day, roughly 1% of them trucks, projected to reach 350 by 2035. The structure is 137 ft (41.8 m) long and 37 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mauna Loa Lane over Hcfcd Ditch built?
It was built in 1988, making it 37 years old in 2025.
What condition is Mauna Loa Lane over Hcfcd Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Mauna Loa Lane over Hcfcd Ditch carry?
About 4,130 vehicles per day (2016 count), of which roughly 1% are trucks.
How long is Mauna Loa Lane over Hcfcd Ditch?
The structure is 137 ft (41.8 m) long with a longest span of 46 ft (14 m) and a deck 37 ft wide.
Who owns Mauna Loa Lane over Hcfcd Ditch?
It is owned by the County Highway Agency.