Woodland West DR over Hcfcd Ditch
FairPosted for loadHarris County, Texas · 0.02 MI N of Battle Oak D · Structure no. 121020AA2445001
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected August 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 75 ft
- 3 main spans
- Daily traffic
- 1,000
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Woodland West DR over Hcfcd Ditch is a prestressed concrete slab carrying Woodland West DR over Hcfcd Ditch in Harris County, Texas. It was built in 1979, so it is 46 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1,000 vehicles a day, roughly 1% of them trucks, projected to reach 1,500 by 2035. The structure is 75 ft (22.9 m) long and 37 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Woodland West DR over Hcfcd Ditch built?
It was built in 1979, making it 46 years old in 2025.
What condition is Woodland West DR over Hcfcd Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Woodland West DR over Hcfcd Ditch carry?
About 1,000 vehicles per day (2015 count), of which roughly 1% are trucks.
How long is Woodland West DR over Hcfcd Ditch?
The structure is 75 ft (22.9 m) long with a longest span of 25 ft (7.6 m) and a deck 37 ft wide.
Who owns Woodland West DR over Hcfcd Ditch?
It is owned by the County Highway Agency.