Trail Side Drive over Horse Pen Creek
FairHarris County, Texas · 0.1 MI S of El Miranda · Structure no. 121020AA0482001
- Built
- 1976
- 49 years old
- Condition
- Fair
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 122 ft
- 2 main spans
- Daily traffic
- 2,200
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Trail Side Drive over Horse Pen Creek is a prestressed concrete box beam or girders - multiple carrying Trail Side Drive over Horse Pen Creek in Harris County, Texas. It was built in 1976, so it is 49 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,200 vehicles a day, roughly 1% of them trucks, projected to reach 3,000 by 2035. The structure is 122 ft (37.2 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Trail Side Drive over Horse Pen Creek built?
It was built in 1976, making it 49 years old in 2025.
What condition is Trail Side Drive over Horse Pen Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Trail Side Drive over Horse Pen Creek carry?
About 2,200 vehicles per day (2015 count), of which roughly 1% are trucks.
How long is Trail Side Drive over Horse Pen Creek?
The structure is 122 ft (37.2 m) long with a longest span of 60 ft (18.3 m) and a deck 41 ft wide.
Who owns Trail Side Drive over Horse Pen Creek?
It is owned by the County Highway Agency.