US Bridges

Timber Forest DR over Hcfcd Ditch

Good

Harris County, Texas · 0.70 MI S of Will Clayton · Structure no. 121020A30054001

Built
2004
21 years old
Condition
Good
inspected December 2023
Type
Culvert
Concrete
Length
34 ft
2 main spans
Daily traffic
1,500
2014 count
Owner
County
County Highway Agency

About this bridge

Timber Forest DR over Hcfcd Ditch is a concrete culvert carrying Timber Forest DR over Hcfcd Ditch in Harris County, Texas. It was built in 2004, so it is 21 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,500 vehicles a day, projected to reach 3,000 by 2034. The structure is 34 ft (10.4 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTimber Forest DR
CrossesHcfcd Ditch
Location0.70 MI S of Will Clayton
RouteCounty Highway 0
StateTexas
Coordinates29.96879, -95.19263
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length34 ft (10.4 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2014)
Projected traffic3,000 by 2034
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Timber Forest DR over Hcfcd Ditch built?

It was built in 2004, making it 21 years old in 2025.

What condition is Timber Forest DR over Hcfcd Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Timber Forest DR over Hcfcd Ditch carry?

About 1,500 vehicles per day (2014 count).

How long is Timber Forest DR over Hcfcd Ditch?

The structure is 34 ft (10.4 m) long with a longest span of 12 ft (3.7 m).

Who owns Timber Forest DR over Hcfcd Ditch?

It is owned by the County Highway Agency.