Pine Trace Village over Hcfcd Ditch M112-00-00
GoodHarris County, Texas · 0.04 MI E of Stuebner Air · Structure no. 121020A18029072
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 147 ft
- 3 main spans
- Daily traffic
- 250
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Pine Trace Village over Hcfcd Ditch M112-00-00 is a prestressed concrete stringer/multi-beam or girder carrying Pine Trace Village over Hcfcd Ditch M112-00-00 in Harris County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 250 vehicles a day, roughly 1% of them trucks, projected to reach 400 by 2042. The structure is 147 ft (44.8 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pine Trace Village over Hcfcd Ditch M112-00-00 built?
It was built in 2018, making it 7 years old in 2025.
What condition is Pine Trace Village over Hcfcd Ditch M112-00-00 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Pine Trace Village over Hcfcd Ditch M112-00-00 carry?
About 250 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Pine Trace Village over Hcfcd Ditch M112-00-00?
The structure is 147 ft (44.8 m) long with a longest span of 71 ft (21.6 m) and a deck 42 ft wide.
Who owns Pine Trace Village over Hcfcd Ditch M112-00-00?
It is owned by the County Highway Agency.