US Bridges

Bw 8 Kirby Ramp over Natural Ground

Good

Harris County, Texas · Inter of SH 288 & Bw 8 · Structure no. 121020325604509

Built
2019
6 years old
Condition
Good
inspected December 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
533 ft
5 main spans
Daily traffic
8,000
2012 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Bw 8 Kirby Ramp over Natural Ground is a prestressed concrete stringer/multi-beam or girder carrying Bw 8 Kirby Ramp over Natural Ground in Harris County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,000 vehicles a day, projected to reach 8,000 by 2030. The structure is 533 ft (162.5 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBw 8 Kirby Ramp
CrossesNatural Ground
LocationInter of SH 288 & Bw 8
RouteState Highway 8
StateTexas
Coordinates29.59757, -95.38897
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHL 93
Structure length533 ft (162.5 m)
Longest span107 ft (32.6 m)
Deck width27 ft (8.2 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deck34 ft (10.3 m)

Traffic and service

Average daily traffic8,000 (2012)
Projected traffic8,000 by 2030
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Bw 8 Kirby Ramp over Natural Ground built?

It was built in 2019, making it 6 years old in 2025.

What condition is Bw 8 Kirby Ramp over Natural Ground in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2022.

How much traffic does Bw 8 Kirby Ramp over Natural Ground carry?

About 8,000 vehicles per day (2012 count).

How long is Bw 8 Kirby Ramp over Natural Ground?

The structure is 533 ft (162.5 m) long with a longest span of 107 ft (32.6 m) and a deck 27 ft wide.

Who owns Bw 8 Kirby Ramp over Natural Ground?

It is owned by the Local Toll Authority.