Bw 8 Ebfr over Hcfcd Ditch A-125-00-00
GoodHarris County, Texas · 0.50 MI E of SH 35 · Structure no. 121020325604266
- Built
- 1993
- 32 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 80 ft
- 1 main span
- Daily traffic
- 14,131
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
Bw 8 Ebfr over Hcfcd Ditch A-125-00-00 is a prestressed concrete stringer/multi-beam or girder carrying Bw 8 Ebfr over Hcfcd Ditch A-125-00-00 in Harris County, Texas. It was built in 1993, so it is 32 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,131 vehicles a day, roughly 7% of them trucks, projected to reach 17,390 by 2033. The structure is 80 ft (24.4 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bw 8 Ebfr over Hcfcd Ditch A-125-00-00 built?
It was built in 1993, making it 32 years old in 2025.
What condition is Bw 8 Ebfr over Hcfcd Ditch A-125-00-00 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Bw 8 Ebfr over Hcfcd Ditch A-125-00-00 carry?
About 14,131 vehicles per day (2019 count), of which roughly 7% are trucks.
How long is Bw 8 Ebfr over Hcfcd Ditch A-125-00-00?
The structure is 80 ft (24.4 m) long with a longest span of 78 ft (23.8 m) and a deck 43 ft wide.
Who owns Bw 8 Ebfr over Hcfcd Ditch A-125-00-00?
It is owned by the State Highway Agency.