Bw 8 over Hcfcd Ditch N-111-00-00
FairHarris County, Texas · 0.40 MI N of Woodforest · Structure no. 121020325603257
- Built
- 1994
- 31 years old
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 115 ft
- 1 main span
- Daily traffic
- 97,071
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Bw 8 over Hcfcd Ditch N-111-00-00 is a prestressed concrete stringer/multi-beam or girder carrying Bw 8 over Hcfcd Ditch N-111-00-00 in Harris County, Texas. It was built in 1994, so it is 31 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 97,071 vehicles a day, roughly 10% of them trucks, projected to reach 174,189 by 2041. The structure is 115 ft (35.1 m) long and 158 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bw 8 over Hcfcd Ditch N-111-00-00 built?
It was built in 1994, making it 31 years old in 2025.
What condition is Bw 8 over Hcfcd Ditch N-111-00-00 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Bw 8 over Hcfcd Ditch N-111-00-00 carry?
About 97,071 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is Bw 8 over Hcfcd Ditch N-111-00-00?
The structure is 115 ft (35.1 m) long with a longest span of 115 ft (35.1 m) and a deck 158 ft wide.
Who owns Bw 8 over Hcfcd Ditch N-111-00-00?
It is owned by the State Highway Agency.