US Bridges

Bw 8 WB over Hollister Road

Fair

Harris County, Texas · 0.6 MI E of SH 249 · Structure no. 121020325602222

Built
1989
36 years old, rebuilt 2003
Condition
Fair
inspected November 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
276 ft
1 main span
Daily traffic
22,000
2014 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Bw 8 WB over Hollister Road is a prestressed concrete stringer/multi-beam or girder carrying Bw 8 WB over Hollister Road in Harris County, Texas. It was built in 1989 and reconstructed in 2003, so it is 36 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 22,000 vehicles a day, roughly 4% of them trucks, projected to reach 56,270 by 2034. The structure is 276 ft (84.1 m) long and 72 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesBw 8 WB
CrossesHollister Road
Location0.6 MI E of SH 249
StateTexas
Coordinates29.9372, -95.50749
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length276 ft (84.1 m)
Longest span116 ft (35.4 m)
Deck width72 ft (21.8 m)
Roadway width69 ft (21 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,000 (2014)
Projected traffic56,270 by 2034
Trucks4%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed8.1 mi (13 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Bw 8 WB over Hollister Road built?

It was built in 1989, making it 36 years old in 2025. It was reconstructed in 2003.

What condition is Bw 8 WB over Hollister Road in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2022.

How much traffic does Bw 8 WB over Hollister Road carry?

About 22,000 vehicles per day (2014 count), of which roughly 4% are trucks.

How long is Bw 8 WB over Hollister Road?

The structure is 276 ft (84.1 m) long with a longest span of 116 ft (35.4 m) and a deck 72 ft wide.

Who owns Bw 8 WB over Hollister Road?

It is owned by the Local Toll Authority.