US Bridges

FM 2920 over Hcfcd Ditch K124-02-00

Good

Harris County, Texas · 2.0 MI W of IH 45 · Structure no. 121020294102004

Built
1991
34 years old
Condition
Good
inspected September 2024
Type
Slab
Concrete Continuous
Length
75 ft
3 main spans
Daily traffic
32,248
2023 count
Owner
State
State Highway Agency

About this bridge

FM 2920 over Hcfcd Ditch K124-02-00 is a concrete continuous slab carrying FM 2920 over Hcfcd Ditch K124-02-00 in Harris County, Texas. It was built in 1991, so it is 34 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 32,248 vehicles a day, roughly 2% of them trucks, projected to reach 45,147 by 2042. The structure is 75 ft (22.9 m) long and 81 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesFM 2920
CrossesHcfcd Ditch K124-02-00
Location2.0 MI W of IH 45
RouteState Highway 2920
StateTexas
Coordinates30.07059, -95.46767
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.7 US tons
Inventory rating35.8 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length75 ft (22.9 m)
Longest span25 ft (7.6 m)
Deck width81 ft (24.6 m)
Roadway width78 ft (23.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic32,248 (2023)
Projected traffic45,147 by 2042
Trucks2%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2920 over Hcfcd Ditch K124-02-00 built?

It was built in 1991, making it 34 years old in 2025.

What condition is FM 2920 over Hcfcd Ditch K124-02-00 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does FM 2920 over Hcfcd Ditch K124-02-00 carry?

About 32,248 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is FM 2920 over Hcfcd Ditch K124-02-00?

The structure is 75 ft (22.9 m) long with a longest span of 25 ft (7.6 m) and a deck 81 ft wide.

Who owns FM 2920 over Hcfcd Ditch K124-02-00?

It is owned by the State Highway Agency.