FM 525 over Hardy Toll RD & UP RR
FairHarris County, Texas · 2 MI N of Aldine Mail Rt · Structure no. 121020100501026
- Built
- 1987
- 38 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,008 ft
- 10 main spans
- Daily traffic
- 22,053
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
FM 525 over Hardy Toll RD & UP RR is a prestressed concrete stringer/multi-beam or girder carrying FM 525 over Hardy Toll RD & UP RR in Harris County, Texas. It was built in 1987, so it is 38 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 22,053 vehicles a day, roughly 8% of them trucks, projected to reach 35,162 by 2041. The structure is 1,008 ft (307.2 m) long and 96 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 525 over Hardy Toll RD & UP RR built?
It was built in 1987, making it 38 years old in 2025.
What condition is FM 525 over Hardy Toll RD & UP RR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does FM 525 over Hardy Toll RD & UP RR carry?
About 22,053 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is FM 525 over Hardy Toll RD & UP RR?
The structure is 1,008 ft (307.2 m) long with a longest span of 104 ft (31.7 m) and a deck 96 ft wide.
Who owns FM 525 over Hardy Toll RD & UP RR?
It is owned by the State Highway Agency.