US Bridges

SH 249 NB over FM 1960 Ml & FR

Fair

Harris County, Texas · At JCT FM 1960 · Structure no. 121020072003194

Built
1997
28 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
431 ft
4 main spans
Daily traffic
63,429
2023 count
Owner
State
State Highway Agency

About this bridge

SH 249 NB over FM 1960 Ml & FR is a prestressed concrete stringer/multi-beam or girder carrying SH 249 NB over FM 1960 Ml & FR in Harris County, Texas. It was built in 1997, so it is 28 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 63,429 vehicles a day, roughly 5% of them trucks, projected to reach 88,801 by 2042. The structure is 431 ft (131.4 m) long and 73 ft wide.

CarriesSH 249 NB
CrossesFM 1960 Ml & FR
LocationAt JCT FM 1960
RouteState Highway 249
StateTexas
Coordinates29.96086, -95.54726
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4 (+7 approach)
Design loadHS 20
Structure length431 ft (131.4 m)
Longest span97 ft (29.6 m)
Deck width73 ft (22.1 m)
Roadway width71 ft (21.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic63,429 (2023)
Projected traffic88,801 by 2042
Trucks5%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 249 NB over FM 1960 Ml & FR built?

It was built in 1997, making it 28 years old in 2025.

What condition is SH 249 NB over FM 1960 Ml & FR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does SH 249 NB over FM 1960 Ml & FR carry?

About 63,429 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is SH 249 NB over FM 1960 Ml & FR?

The structure is 431 ft (131.4 m) long with a longest span of 97 ft (29.6 m) and a deck 73 ft wide.

Who owns SH 249 NB over FM 1960 Ml & FR?

It is owned by the State Highway Agency.