SH 225 EB over Goodyear RR & DR
FairHarris County, Texas · 1.25 MI E of IH 610 · Structure no. 121020050201013
- Built
- 1962
- 63 years old, rebuilt 1989
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 646 ft
- 12 main spans
- Daily traffic
- 56,000
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
SH 225 EB over Goodyear RR & DR is a prestressed concrete stringer/multi-beam or girder carrying SH 225 EB over Goodyear RR & DR in Harris County, Texas. It was built in 1962 and reconstructed in 1989, so it is 63 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 56,000 vehicles a day, roughly 10% of them trucks, projected to reach 78,400 by 2033. The structure is 646 ft (196.9 m) long and 72 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 225 EB over Goodyear RR & DR built?
It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1989.
What condition is SH 225 EB over Goodyear RR & DR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does SH 225 EB over Goodyear RR & DR carry?
About 56,000 vehicles per day (2013 count), of which roughly 10% are trucks.
How long is SH 225 EB over Goodyear RR & DR?
The structure is 646 ft (196.9 m) long with a longest span of 56 ft (17.1 m) and a deck 72 ft wide.
Who owns SH 225 EB over Goodyear RR & DR?
It is owned by the State Highway Agency.