IH45SB to IH610 WB over IH610 CONN;IH45SBFR
GoodHarris County, Texas · IH 45 at IH 610 · Structure no. 121020050003449
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 3,056 ft
- 2 main spans
- Daily traffic
- 12,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
IH45SB to IH610 WB over IH610 CONN;IH45SBFR is a steel continuous stringer/multi-beam or girder carrying IH45SB to IH610 WB over IH610 CONN;IH45SBFR in Harris County, Texas. It was built in 2020, so it is 5 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 12,000 vehicles a day, roughly 10% of them trucks, projected to reach 13,696 by 2036. The structure is 3,056 ft (931.4 m) long and 31 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH45SB to IH610 WB over IH610 CONN;IH45SBFR built?
It was built in 2020, making it 5 years old in 2025.
What condition is IH45SB to IH610 WB over IH610 CONN;IH45SBFR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does IH45SB to IH610 WB over IH610 CONN;IH45SBFR carry?
About 12,000 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is IH45SB to IH610 WB over IH610 CONN;IH45SBFR?
The structure is 3,056 ft (931.4 m) long with a longest span of 228 ft (69.6 m) and a deck 31 ft wide.
Who owns IH45SB to IH610 WB over IH610 CONN;IH45SBFR?
It is owned by the State Highway Agency.