IH45 NB to BW8 EB over IH 45 Nbfr & Bw 8 Ebfr
GoodHarris County, Texas · 1.80 MI NW of FM 1959 · Structure no. 121020050003343
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected November 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,228 ft
- 13 main spans
- Daily traffic
- 12,002
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
IH45 NB to BW8 EB over IH 45 Nbfr & Bw 8 Ebfr is a prestressed concrete stringer/multi-beam or girder carrying IH45 NB to BW8 EB over IH 45 Nbfr & Bw 8 Ebfr in Harris County, Texas. It was built in 1996, so it is 29 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 12,002 vehicles a day, roughly 8% of them trucks, projected to reach 22,170 by 2033. The structure is 1,228 ft (374.3 m) long and 29 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH45 NB to BW8 EB over IH 45 Nbfr & Bw 8 Ebfr built?
It was built in 1996, making it 29 years old in 2025.
What condition is IH45 NB to BW8 EB over IH 45 Nbfr & Bw 8 Ebfr in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.
How much traffic does IH45 NB to BW8 EB over IH 45 Nbfr & Bw 8 Ebfr carry?
About 12,002 vehicles per day (2019 count), of which roughly 8% are trucks.
How long is IH45 NB to BW8 EB over IH 45 Nbfr & Bw 8 Ebfr?
The structure is 1,228 ft (374.3 m) long with a longest span of 100 ft (30.5 m) and a deck 29 ft wide.
Who owns IH45 NB to BW8 EB over IH 45 Nbfr & Bw 8 Ebfr?
It is owned by the State Highway Agency.