SP330E to SH 146 C over SH 146
GoodHarris County, Texas · At Int SH 146 & Spur 330 · Structure no. 121020038913344
- Built
- 2010
- 15 years old, rebuilt 2014
- Condition
- Good
- inspected December 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 4,334 ft
- 1 main span
- Daily traffic
- 51,900
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
SP330E to SH 146 C over SH 146 is a prestressed concrete stringer/multi-beam or girder carrying SP330E to SH 146 C over SH 146 in Harris County, Texas. It was built in 2010 and reconstructed in 2014, so it is 15 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 51,900 vehicles a day, projected to reach 99,200 by 2033. The structure is 4,334 ft (1,321 m) long and 29 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SP330E to SH 146 C over SH 146 built?
It was built in 2010, making it 15 years old in 2025. It was reconstructed in 2014.
What condition is SP330E to SH 146 C over SH 146 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2022.
How much traffic does SP330E to SH 146 C over SH 146 carry?
About 51,900 vehicles per day (2013 count).
How long is SP330E to SH 146 C over SH 146?
The structure is 4,334 ft (1,321 m) long with a longest span of 145 ft (44.2 m) and a deck 29 ft wide.
Who owns SP330E to SH 146 C over SH 146?
It is owned by the State Highway Agency.