IH 610 WB Ramp over SH 288 NB

Good

Harris County, Texas · IH610 WB Ramp to SH 288 N · Structure no. 121020027116735

Built
2020
5 years old
Condition
Good
inspected December 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
910 ft
7 main spans
Daily traffic
17,113
2015 count
Owner
State
State Highway Agency

About this bridge

IH 610 WB Ramp over SH 288 NB is a prestressed concrete stringer/multi-beam or girder carrying IH 610 WB Ramp over SH 288 NB in Harris County, Texas. It was built in 2020, so it is 5 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,113 vehicles a day, roughly 20% of them trucks, projected to reach 1 by 1900. The structure is 910 ft (277.4 m) long and 31 ft wide.

CarriesIH 610 WB Ramp
CrossesSH 288 NB
LocationIH610 WB Ramp to SH 288 N
RouteState Highway 102
StateTexas
Coordinates29.68125, -95.37755
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans7
Design loadHL 93
Structure length910 ft (277.4 m)
Longest span130 ft (39.6 m)
Deck width31 ft (9.6 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,113 (2015)
Projected traffic1 by 1900
Trucks20%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 610 WB Ramp over SH 288 NB built?

It was built in 2020, making it 5 years old in 2025.

What condition is IH 610 WB Ramp over SH 288 NB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2022.

How much traffic does IH 610 WB Ramp over SH 288 NB carry?

About 17,113 vehicles per day (2015 count), of which roughly 20% are trucks.

How long is IH 610 WB Ramp over SH 288 NB?

The structure is 910 ft (277.4 m) long with a longest span of 130 ft (39.6 m) and a deck 31 ft wide.

Who owns IH 610 WB Ramp over SH 288 NB?

It is owned by the State Highway Agency.