IH 610 Nbfr over Hempstead HWY & UPRR
GoodHarris County, Texas · IH 610 at Hempstead HWY · Structure no. 121020027114693
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,059 ft
- 8 main spans
- Daily traffic
- 14,500
- 2011 count
- Owner
- State
- State Highway Agency
About this bridge
IH 610 Nbfr over Hempstead HWY & UPRR is a prestressed concrete stringer/multi-beam or girder carrying IH 610 Nbfr over Hempstead HWY & UPRR in Harris County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,500 vehicles a day, roughly 1% of them trucks, projected to reach 17,180 by 2031. The structure is 1,059 ft (322.8 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 610 Nbfr over Hempstead HWY & UPRR built?
It was built in 2017, making it 8 years old in 2025.
What condition is IH 610 Nbfr over Hempstead HWY & UPRR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does IH 610 Nbfr over Hempstead HWY & UPRR carry?
About 14,500 vehicles per day (2011 count), of which roughly 1% are trucks.
How long is IH 610 Nbfr over Hempstead HWY & UPRR?
The structure is 1,059 ft (322.8 m) long with a longest span of 128 ft (39 m) and a deck 46 ft wide.
Who owns IH 610 Nbfr over Hempstead HWY & UPRR?
It is owned by the State Highway Agency.