US Bridges

FM 521 over Holmes RD & BNSF RR

Good

Harris County, Texas · 0.7 MI S of IH 610 · Structure no. 121020011101064

Built
1985
40 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
938 ft
8 main spans
Daily traffic
18,618
2022 count
Owner
State
State Highway Agency

About this bridge

FM 521 over Holmes RD & BNSF RR is a prestressed concrete stringer/multi-beam or girder carrying FM 521 over Holmes RD & BNSF RR in Harris County, Texas. It was built in 1985, so it is 40 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,618 vehicles a day, roughly 6% of them trucks, projected to reach 26,065 by 2042. The structure is 938 ft (285.9 m) long and 67 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesFM 521
CrossesHolmes RD & BNSF RR
Location0.7 MI S of IH 610
RouteState Highway 521
StateTexas
Coordinates29.67067, -95.39704
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating38 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans8 (+5 approach)
Design loadUnknown
Structure length938 ft (285.9 m)
Longest span84 ft (25.6 m)
Deck width67 ft (20.5 m)
Roadway width62 ft (19 m)
Vertical clearance over deck16 ft (5 m)

Traffic and service

Average daily traffic18,618 (2022)
Projected traffic26,065 by 2042
Trucks6%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FM 521 over Holmes RD & BNSF RR built?

It was built in 1985, making it 40 years old in 2025.

What condition is FM 521 over Holmes RD & BNSF RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does FM 521 over Holmes RD & BNSF RR carry?

About 18,618 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is FM 521 over Holmes RD & BNSF RR?

The structure is 938 ft (285.9 m) long with a longest span of 84 ft (25.6 m) and a deck 67 ft wide.

Who owns FM 521 over Holmes RD & BNSF RR?

It is owned by the State Highway Agency.