US Bridges

IH 45 SB / Bw 8 EB over Bw 8 & IH 45

Good

Harris County, Texas · IH 45 & Bw 8 Interchange · Structure no. 121020011006385

Built
2003
22 years old
Condition
Good
inspected September 2024
Type
Box Beam or Girders - Multiple
Steel Continuous
Length
1,962 ft
8 main spans
Daily traffic
6,957
2021 count
Owner
State
State Highway Agency

About this bridge

IH 45 SB / Bw 8 EB over Bw 8 & IH 45 is a steel continuous box beam or girders - multiple carrying IH 45 SB / Bw 8 EB over Bw 8 & IH 45 in Harris County, Texas. It was built in 2003, so it is 22 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,957 vehicles a day, roughly 6% of them trucks, projected to reach 10,436 by 2041. The structure is 1,962 ft (598 m) long and 39 ft wide.

CarriesIH 45 SB / Bw 8 EB
CrossesBw 8 & IH 45
LocationIH 45 & Bw 8 Interchange
RouteInterstate 45
StateTexas
Coordinates29.94291, -95.41516
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans8 (+3 approach)
Design loadUnknown
Structure length1,962 ft (598 m)
Longest span290 ft (88.4 m)
Deck width39 ft (11.8 m)
Roadway width36 ft (11 m)
Vertical clearance over deck21 ft (6.3 m)

Traffic and service

Average daily traffic6,957 (2021)
Projected traffic10,436 by 2041
Trucks6%
Lanes on structure1
Traffic directionOne-way traffic
CarriesFourth level (interchange)
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 45 SB / Bw 8 EB over Bw 8 & IH 45 built?

It was built in 2003, making it 22 years old in 2025.

What condition is IH 45 SB / Bw 8 EB over Bw 8 & IH 45 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does IH 45 SB / Bw 8 EB over Bw 8 & IH 45 carry?

About 6,957 vehicles per day (2021 count), of which roughly 6% are trucks.

How long is IH 45 SB / Bw 8 EB over Bw 8 & IH 45?

The structure is 1,962 ft (598 m) long with a longest span of 290 ft (88.4 m) and a deck 39 ft wide.

Who owns IH 45 SB / Bw 8 EB over Bw 8 & IH 45?

It is owned by the State Highway Agency.