IH 45 SB over FM 2920 (spring Cypress)
FairHarris County, Texas · 3.75 MI N of FM 1960 · Structure no. 121020011005180
- Built
- 2002
- 23 years old
- Condition
- Fair
- inspected September 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 324 ft
- 3 main spans
- Daily traffic
- 97,683
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
IH 45 SB over FM 2920 (spring Cypress) is a prestressed concrete stringer/multi-beam or girder carrying IH 45 SB over FM 2920 (spring Cypress) in Harris County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 97,683 vehicles a day, roughly 9% of them trucks, projected to reach 136,756 by 2041. The structure is 324 ft (98.8 m) long and 108 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 45 SB over FM 2920 (spring Cypress) built?
It was built in 2002, making it 23 years old in 2025.
What condition is IH 45 SB over FM 2920 (spring Cypress) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2022.
How much traffic does IH 45 SB over FM 2920 (spring Cypress) carry?
About 97,683 vehicles per day (2021 count), of which roughly 9% are trucks.
How long is IH 45 SB over FM 2920 (spring Cypress)?
The structure is 324 ft (98.8 m) long with a longest span of 124 ft (37.8 m) and a deck 108 ft wide.
Who owns IH 45 SB over FM 2920 (spring Cypress)?
It is owned by the State Highway Agency.