US 290 over Eldridge RD & West RD
FairHarris County, Texas · 1.3 MI SE of FM 1960 · Structure no. 121020005008107
- Built
- 1989
- 36 years old, rebuilt 2018
- Condition
- Fair
- inspected October 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 2,063 ft
- 2 main spans
- Daily traffic
- 188,024
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
US 290 over Eldridge RD & West RD is a prestressed concrete stringer/multi-beam or girder carrying US 290 over Eldridge RD & West RD in Harris County, Texas. It was built in 1989 and reconstructed in 2018, so it is 36 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 188,024 vehicles a day, roughly 10% of them trucks, projected to reach 256,824 by 2033. The structure is 2,063 ft (628.8 m) long and 192 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 290 over Eldridge RD & West RD built?
It was built in 1989, making it 36 years old in 2025. It was reconstructed in 2018.
What condition is US 290 over Eldridge RD & West RD in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2022.
How much traffic does US 290 over Eldridge RD & West RD carry?
About 188,024 vehicles per day (2019 count), of which roughly 10% are trucks.
How long is US 290 over Eldridge RD & West RD?
The structure is 2,063 ft (628.8 m) long with a longest span of 120 ft (36.6 m) and a deck 192 ft wide.
Who owns US 290 over Eldridge RD & West RD?
It is owned by the State Highway Agency.