US Bridges

US 290 Ml over Fairfield Channel

Good

Harris County, Texas · 3.60 MI NW Barker-Cypress · Structure no. 121020005006175

Built
2006
19 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
127 ft
3 main spans
Daily traffic
65,080
2020 count
Owner
State
State Highway Agency

About this bridge

US 290 Ml over Fairfield Channel is a prestressed concrete stringer/multi-beam or girder carrying US 290 Ml over Fairfield Channel in Harris County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 65,080 vehicles a day, roughly 10% of them trucks, projected to reach 106,140 by 2033. The structure is 127 ft (38.7 m) long and 187 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 290 Ml
CrossesFairfield Channel
Location3.60 MI NW Barker-Cypress
RouteU.S. Route 290
StateTexas
Coordinates29.98332, -95.72751
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length127 ft (38.7 m)
Longest span42 ft (12.8 m)
Deck width187 ft (56.9 m)
Roadway width131 ft (40 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic65,080 (2020)
Projected traffic106,140 by 2033
Trucks10%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 290 Ml over Fairfield Channel built?

It was built in 2006, making it 19 years old in 2025.

What condition is US 290 Ml over Fairfield Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does US 290 Ml over Fairfield Channel carry?

About 65,080 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is US 290 Ml over Fairfield Channel?

The structure is 127 ft (38.7 m) long with a longest span of 42 ft (12.8 m) and a deck 187 ft wide.

Who owns US 290 Ml over Fairfield Channel?

It is owned by the State Highway Agency.