Barker-Cypress RD over UP RR & FR Turnaround
FairHarris County, Texas · 4.50 MI NW of FM 1960 · Structure no. 121020005006128
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected November 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 365 ft
- 5 main spans
- Daily traffic
- 32,070
- 2012 count
- Owner
- State
- State Highway Agency
About this bridge
Barker-Cypress RD over UP RR & FR Turnaround is a prestressed concrete stringer/multi-beam or girder carrying Barker-Cypress RD over UP RR & FR Turnaround in Harris County, Texas. It was built in 1991, so it is 34 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 32,070 vehicles a day, roughly 10% of them trucks, projected to reach 64,540 by 2032. The structure is 365 ft (111.3 m) long and 71 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Barker-Cypress RD over UP RR & FR Turnaround built?
It was built in 1991, making it 34 years old in 2025.
What condition is Barker-Cypress RD over UP RR & FR Turnaround in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2022.
How much traffic does Barker-Cypress RD over UP RR & FR Turnaround carry?
About 32,070 vehicles per day (2012 count), of which roughly 10% are trucks.
How long is Barker-Cypress RD over UP RR & FR Turnaround?
The structure is 365 ft (111.3 m) long with a longest span of 75 ft (22.9 m) and a deck 71 ft wide.
Who owns Barker-Cypress RD over UP RR & FR Turnaround?
It is owned by the State Highway Agency.