US Bridges

US 90 over Krenek RD

Good

Harris County, Texas · 1.20 MI NE of FM 2100 · Structure no. 121020002802251

Built
2002
23 years old
Condition
Good
inspected October 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
280 ft
3 main spans
Daily traffic
18,669
2021 count
Owner
State
State Highway Agency

About this bridge

US 90 over Krenek RD is a prestressed concrete stringer/multi-beam or girder carrying US 90 over Krenek RD in Harris County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,669 vehicles a day, roughly 11% of them trucks, projected to reach 26,137 by 2041. The structure is 280 ft (85.3 m) long and 81 ft wide.

CarriesUS 90
CrossesKrenek RD
Location1.20 MI NE of FM 2100
RouteU.S. Route 90
StateTexas
Coordinates29.89955, -95.05481
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length280 ft (85.3 m)
Longest span100 ft (30.5 m)
Deck width81 ft (24.7 m)
Roadway width76 ft (23.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,669 (2021)
Projected traffic26,137 by 2041
Trucks11%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 90 over Krenek RD built?

It was built in 2002, making it 23 years old in 2025.

What condition is US 90 over Krenek RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2022.

How much traffic does US 90 over Krenek RD carry?

About 18,669 vehicles per day (2021 count), of which roughly 11% are trucks.

How long is US 90 over Krenek RD?

The structure is 280 ft (85.3 m) long with a longest span of 100 ft (30.5 m) and a deck 81 ft wide.

Who owns US 90 over Krenek RD?

It is owned by the State Highway Agency.