SP 527 NB over Alabama Milam Rp Hov
GoodHarris County, Texas · 0.60 MI NE of US 59 · Structure no. 121020002715327
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected August 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 436 ft
- 4 main spans
- Daily traffic
- 25,570
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
SP 527 NB over Alabama Milam Rp Hov is a prestressed concrete stringer/multi-beam or girder carrying SP 527 NB over Alabama Milam Rp Hov in Harris County, Texas. It was built in 2005, so it is 20 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 25,570 vehicles a day, roughly 2% of them trucks, projected to reach 35,800 by 2033. The structure is 436 ft (132.9 m) long and 51 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SP 527 NB over Alabama Milam Rp Hov built?
It was built in 2005, making it 20 years old in 2025.
What condition is SP 527 NB over Alabama Milam Rp Hov in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2022.
How much traffic does SP 527 NB over Alabama Milam Rp Hov carry?
About 25,570 vehicles per day (2013 count), of which roughly 2% are trucks.
How long is SP 527 NB over Alabama Milam Rp Hov?
The structure is 436 ft (132.9 m) long with a longest span of 100 ft (30.5 m) and a deck 51 ft wide.
Who owns SP 527 NB over Alabama Milam Rp Hov?
It is owned by the State Highway Agency.