SH 105 over Pine Island Bayou Relief
GoodHardin County, Texas · 7.30 MI E of SH 326 · Structure no. 201010033904013
- Built
- 1997
- 28 years old
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 126 ft
- 3 main spans
- Daily traffic
- 10,350
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SH 105 over Pine Island Bayou Relief is a prestressed concrete stringer/multi-beam or girder carrying SH 105 over Pine Island Bayou Relief in Hardin County, Texas. It was built in 1997, so it is 28 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,350 vehicles a day, roughly 12% of them trucks, projected to reach 15,525 by 2042. The structure is 126 ft (38.4 m) long and 86 ft wide. If it were closed, the detour would be 26.1 mi (42 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 105 over Pine Island Bayou Relief built?
It was built in 1997, making it 28 years old in 2025.
What condition is SH 105 over Pine Island Bayou Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does SH 105 over Pine Island Bayou Relief carry?
About 10,350 vehicles per day (2022 count), of which roughly 12% are trucks.
How long is SH 105 over Pine Island Bayou Relief?
The structure is 126 ft (38.4 m) long with a longest span of 42 ft (12.8 m) and a deck 86 ft wide.
Who owns SH 105 over Pine Island Bayou Relief?
It is owned by the State Highway Agency.