US Bridges

CR 210 over Leon River

Good

Hamilton County, Texas · 2.90 MI N of FM 2905 · Structure no. 090980AA0168001

Built
2000
25 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
255 ft
3 main spans
Daily traffic
50
2020 count
Owner
County
County Highway Agency

About this bridge

CR 210 over Leon River is a prestressed concrete stringer/multi-beam or girder carrying CR 210 over Leon River in Hamilton County, Texas. It was built in 2000, so it is 25 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 45 by 2036. The structure is 255 ft (77.7 m) long and 26 ft wide. If it were closed, the detour would be 11.2 mi (18 km).

CarriesCR 210
CrossesLeon River
Location2.90 MI N of FM 2905
RouteCounty Highway 210
StateTexas
Coordinates31.7835, -98.06013
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length255 ft (77.7 m)
Longest span85 ft (25.9 m)
Deck width26 ft (7.9 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2020)
Projected traffic45 by 2036
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 210 over Leon River built?

It was built in 2000, making it 25 years old in 2025.

What condition is CR 210 over Leon River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does CR 210 over Leon River carry?

About 50 vehicles per day (2020 count).

How long is CR 210 over Leon River?

The structure is 255 ft (77.7 m) long with a longest span of 85 ft (25.9 m) and a deck 26 ft wide.

Who owns CR 210 over Leon River?

It is owned by the County Highway Agency.