US Bridges

FM 2486 over S Mesquite Creek

Good

Hamilton County, Texas · 2.1 MI NW of FM 218 · Structure no. 090980239102006

Built
1959
66 years old
Condition
Good
inspected January 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
90 ft
3 main spans
Daily traffic
183
2020 count
Owner
State
State Highway Agency

About this bridge

FM 2486 over S Mesquite Creek is a concrete stringer/multi-beam or girder carrying FM 2486 over S Mesquite Creek in Hamilton County, Texas. It was built in 1959, so it is 66 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 183 vehicles a day, roughly 11% of them trucks, projected to reach 271 by 2039. The structure is 90 ft (27.4 m) long and 25 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesFM 2486
CrossesS Mesquite Creek
Location2.1 MI NW of FM 218
RouteState Highway 2486
StateTexas
Coordinates31.71761, -98.23905
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66 US tons
Inventory rating39 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadOther
Structure length90 ft (27.4 m)
Longest span30 ft (9.1 m)
Deck width25 ft (7.5 m)
Roadway width23 ft (6.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic183 (2020)
Projected traffic271 by 2039
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$415,000
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2486 over S Mesquite Creek built?

It was built in 1959, making it 66 years old in 2025.

What condition is FM 2486 over S Mesquite Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does FM 2486 over S Mesquite Creek carry?

About 183 vehicles per day (2020 count), of which roughly 11% are trucks.

How long is FM 2486 over S Mesquite Creek?

The structure is 90 ft (27.4 m) long with a longest span of 30 ft (9.1 m) and a deck 25 ft wide.

Who owns FM 2486 over S Mesquite Creek?

It is owned by the State Highway Agency.