US Bridges

FM 2472 over Spring Creek

Fair

Hall County, Texas · 1.15 MI S of SH 256 · Structure no. 250970104001006

Built
1953
72 years old
Condition
Fair
inspected May 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
90 ft
3 main spans
Daily traffic
100
2020 count
Owner
State
State Highway Agency

About this bridge

FM 2472 over Spring Creek is a concrete stringer/multi-beam or girder carrying FM 2472 over Spring Creek in Hall County, Texas. It was built in 1953, so it is 72 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 22% of them trucks, projected to reach 110 by 2033. The structure is 90 ft (27.4 m) long and 25 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesFM 2472
CrossesSpring Creek
Location1.15 MI S of SH 256
RouteState Highway 2472
StateTexas
Coordinates34.67128, -100.64671
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51 US tons
Inventory rating31 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadH 15
Structure length90 ft (27.4 m)
Longest span30 ft (9.1 m)
Deck width25 ft (7.6 m)
Roadway width23 ft (6.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2020)
Projected traffic110 by 2033
Trucks22%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2472 over Spring Creek built?

It was built in 1953, making it 72 years old in 2025.

What condition is FM 2472 over Spring Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does FM 2472 over Spring Creek carry?

About 100 vehicles per day (2020 count), of which roughly 22% are trucks.

How long is FM 2472 over Spring Creek?

The structure is 90 ft (27.4 m) long with a longest span of 30 ft (9.1 m) and a deck 25 ft wide.

Who owns FM 2472 over Spring Creek?

It is owned by the State Highway Agency.