US Bridges

IH10 Wbfr over Draw

Good

Guadalupe County, Texas · 8 MI NE of Lp 1604 · Structure no. 150950002503344

Built
2024
1 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
125 ft
3 main spans
Daily traffic
179
2023 count
Owner
State
State Highway Agency

About this bridge

IH10 Wbfr over Draw is a prestressed concrete stringer/multi-beam or girder carrying IH10 Wbfr over Draw in Guadalupe County, Texas. It was built in 2024, so it is 1 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 179 vehicles a day, roughly 4% of them trucks, projected to reach 1 by 1900. The structure is 125 ft (38.1 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH10 Wbfr
CrossesDraw
Location8 MI NE of Lp 1604
RouteInterstate 10
StateTexas
Coordinates29.50782, -98.16953
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length125 ft (38.1 m)
Longest span65 ft (19.8 m)
Deck width51 ft (15.4 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic179 (2023)
Projected traffic1 by 1900
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH10 Wbfr over Draw built?

It was built in 2024, making it 1 years old in 2025.

What condition is IH10 Wbfr over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does IH10 Wbfr over Draw carry?

About 179 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is IH10 Wbfr over Draw?

The structure is 125 ft (38.1 m) long with a longest span of 65 ft (19.8 m) and a deck 51 ft wide.

Who owns IH10 Wbfr over Draw?

It is owned by the State Highway Agency.