FM 3090 over Rocky Creek Relief
GoodGrimes County, Texas · 3.65 MI NW of FM 149 · Structure no. 170940064305049
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 61 ft
- 2 main spans
- Daily traffic
- 274
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
FM 3090 over Rocky Creek Relief is a concrete stringer/multi-beam or girder carrying FM 3090 over Rocky Creek Relief in Grimes County, Texas. It was built in 1996, so it is 29 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 274 vehicles a day, roughly 13% of them trucks, projected to reach 1,022 by 2039. The structure is 61 ft (18.6 m) long and 32 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 3090 over Rocky Creek Relief built?
It was built in 1996, making it 29 years old in 2025.
What condition is FM 3090 over Rocky Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does FM 3090 over Rocky Creek Relief carry?
About 274 vehicles per day (2020 count), of which roughly 13% are trucks.
How long is FM 3090 over Rocky Creek Relief?
The structure is 61 ft (18.6 m) long with a longest span of 30 ft (9.1 m) and a deck 32 ft wide.
Who owns FM 3090 over Rocky Creek Relief?
It is owned by the State Highway Agency.