US Bridges

H G Mosley over Paul G Boorman Trail

Good

Gregg County, Texas · 1.17 MI SW of Spur 502 · Structure no. 100930E00506102

Built
2010
15 years old
Condition
Good
inspected June 2024
Type
Slab
Prestressed Concrete
Length
35 ft
1 main span
Daily traffic
10,938
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

H G Mosley over Paul G Boorman Trail is a prestressed concrete slab carrying H G Mosley over Paul G Boorman Trail in Gregg County, Texas. It was built in 2010, so it is 15 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,938 vehicles a day, roughly 2% of them trucks, projected to reach 16,407 by 2042. The structure is 35 ft (10.7 m) long and 65 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesH G Mosley
CrossesPaul G Boorman Trail
Location1.17 MI SW of Spur 502
RouteCity Street 0
StateTexas
Coordinates32.52468, -94.76208
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length35 ft (10.7 m)
Longest span35 ft (10.7 m)
Deck width65 ft (19.8 m)
Roadway width64 ft (19.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,938 (2018)
Projected traffic16,407 by 2042
Trucks2%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was H G Mosley over Paul G Boorman Trail built?

It was built in 2010, making it 15 years old in 2025.

What condition is H G Mosley over Paul G Boorman Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does H G Mosley over Paul G Boorman Trail carry?

About 10,938 vehicles per day (2018 count), of which roughly 2% are trucks.

How long is H G Mosley over Paul G Boorman Trail?

The structure is 35 ft (10.7 m) long with a longest span of 35 ft (10.7 m) and a deck 65 ft wide.

Who owns H G Mosley over Paul G Boorman Trail?

It is owned by the City or Municipal Highway Agency.