US Bridges

Hillcrest ST over Post Oak Creek

Fair

Grayson County, Texas · 0.05 MI W of Rickett ST · Structure no. 010920C01430001

Built
1970
55 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
52 ft
1 main span
Daily traffic
1,654
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Hillcrest ST over Post Oak Creek is a steel stringer/multi-beam or girder carrying Hillcrest ST over Post Oak Creek in Grayson County, Texas. It was built in 1970, so it is 55 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,654 vehicles a day, projected to reach 3,225 by 2030. The structure is 52 ft (15.9 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHillcrest ST
CrossesPost Oak Creek
Location0.05 MI W of Rickett ST
RouteCity Street 0
StateTexas
Coordinates33.63883, -96.62172
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.9 US tons
Inventory rating38 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length52 ft (15.9 m)
Longest span50 ft (15.2 m)
Deck width35 ft (10.7 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,654 (2023)
Projected traffic3,225 by 2030
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Hillcrest ST over Post Oak Creek built?

It was built in 1970, making it 55 years old in 2025.

What condition is Hillcrest ST over Post Oak Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Hillcrest ST over Post Oak Creek carry?

About 1,654 vehicles per day (2023 count).

How long is Hillcrest ST over Post Oak Creek?

The structure is 52 ft (15.9 m) long with a longest span of 50 ft (15.2 m) and a deck 35 ft wide.

Who owns Hillcrest ST over Post Oak Creek?

It is owned by the City or Municipal Highway Agency.